Project Description
Integrity was contracted to perform a challenging shotcrete scope at the Parkland Refinery which required shotcrete installation from a man-basket in a live plant. Integrity worked closely to develop a plan with the Owner and all stake holders to ensure there were no impacts to the daily operations of the refinery. Integrity provided a detailed work plan that was presented to the Owner that meet both the requirement if zero impact to the plant while providing a well design execution plan that mitigated risks.
Integrity has a detailed and thorough health and safety plan allowing owners to feel comfortable knowing we will complete the work in a timely but safe manner. Parkland Refinery has strict guidelines for work and our team met and exceeded all of Parkland Refinery health and safety requirements. As a result of this project, we were able to develop new safe work procedures that we have not implemented into our safety program. Our health and safety manual is available upon request and can be downloaded directly from our website. Since the successful complete of the project, we have been direct awarded three other projects based on our planning and safety abilities and commitment.